Pig Launcher vs. Pig Receiver: Key Differences in Design and Procurement

Home > News > Filter Industry News  > Pig Launcher vs. Pig Receiver: Key Differences in Design and Procurement

News

The Difference Between A Lug and Wafer Butterfly Valve

The Difference Between A Lug and Wafer Butterfly Valve

2019-02-12 16:59:28

Butterfly valves have been around for a long time, and are used for a variety of applications. They made their first appearance during the 1930s, and have been utilized by several industries ever since. Often made out of cast iron, butterfly valve's name is based from the functionality of its disc.

Wafer type butterfly valve installation instructions and steps

Wafer type butterfly valve installation instructions and steps

2019-01-03 16:27:13

The wafer butterfly valve is one of the most common types of valves in industrial pipelines. The structure of wafer butterfly valve itself is relatively small. It is only necessary to put the butterfly valve in the middle of the flange at both ends of the pipe, and use the stud bolt to pass through the pipe flange and the pair.

Twenty-five Taboos for Valve Installation

Twenty-five Taboos for Valve Installation

2019-09-06 10:23:57

Valves are the most common equipment in chemical companies. It seems easy to install valves, but if they are not implemented in accordance with the re...

Manual valve operation method

Manual valve operation method

2019-04-01 11:50:16

The manual valve is a valve operated by the handle and the hand wheel, and is a commonly used valve on the equipment pipeline.

Butterfly Valve Seat & Seal Ring Replacement Method

Butterfly Valve Seat & Seal Ring Replacement Method

2021-02-01 18:14:53

The butterfly valve disc is a key component of the butterfly valve, which acts on closing and opening and closing. Butterfly valve seat and butterfly ...

Valve common standards and differences

Valve common standards and differences

2019-05-07 17:37:21

DIN standard now uses EN standard structure length
EN 558-1 PN flange connection valve construction length (instead of DIN 3202), EN 558-2 CLASS flange connection valve construction length (instead of BS2080), EN 12982 butt weld end valve construction length (instead of DIN 3202), DIN standard The length of the structure including the length of the API valve is basically the same as the length of the GB...

What's the working principle of Kieselguhr Filter?

What's the working principle of Kieselguhr Filter?

2019-07-01 13:05:32

What is Kieselguhr Filter? What's the working principle of Kieselguhr Filter? The kieselguhr filter (Candle filter /  Cake Filter) which we for customized for fluorine chemical plant six more lithium fluoride phosphate phosphorus process have been installed and working for two years

Resilient Seated Gate Valve

Resilient Seated Gate Valve

2022-10-17 16:09:38

Resilient-seated gate valve with bolted cover connection; made of ductile iron materials and with epoxy coating, designed as both clockwise and anti-c...

New designed PTFE  RPTFE sealing replaceable seat high performance butterfly valve

New designed PTFE RPTFE sealing replaceable seat high performance butterfly valve

2022-04-24 10:39:22

MINOTAUR series replaceable seat high performance butterfly valve

Contact us

RKSfluid Flow Control Company

Web: www.rksfluid.com
Tel:  +86 24 2318 0188
Fax: +86 24 2318 0788
Mail: info@rksfluid.com

Pig Launcher vs. Pig Receiver: Key Differences in Design and Procurement

2026-11-18 09:35:27

Pig Launchers and Pig Receivers are often specified together in oil and gas pipeline projects, but they serve different purposes. A launcher loads and introduces a pig into the pipeline. A receiver collects the pig after it has travelled through the pipeline and provides access for its removal.

This difference affects the barrel arrangement, pipeline connections and equipment configuration. It also means that the two units do not always need to be purchased together.


1. What Is the Difference Between a Pig Launcher and a Pig Receiver?

The main difference is the direction of the pigging operation.

A Pig Launcher  provides the chamber for loading a pipeline pig before it enters the pipeline. The quick opening closure allows access to the barrel for loading and removal of the pig when the equipment is depressurized.

A Pig Receiver is installed at the receiving end of the pipeline section. After the pig arrives, the receiver provides access for retrieval and inspection.

Both units are pressure-containing equipment. Their design must account for the pipeline operating conditions, pig dimensions, connection arrangement and the procedure used to carry out pigging operations.


2. Equipment Arrangement and Main Components

The two units share several components, but their connections and arrangements are determined by their respective functions.

Equipment Main function Typical configuration
Pig Launcher Loads and introduces pigs into the pipeline Barrel,Quick Opening Closure,pipeline connections, valves,pressure gauge and pig detector where specified 
Pig Receiver Collects and allows retrieval of pigs

The barrel must accommodate the selected pig and provide sufficient space for loading or retrieval. Reducers, connection sizes and auxiliary piping are determined by the pipeline design.

The final arrangement should be checked against the approved equipment drawings and operating procedure. A receiver should not simply be treated as a launcher with reversed connections.


3. Technical Specifications

RKSfluid's pigging equipment catalogue gives the following reference specifications:

Parameter Reference Specification 
Nominal Diameter DN150-DN2000
Design Pressure 1.6-16 MPa 
Test Pressure 1.5 × Design Pressure
Applicable Media Crude oil, refined petroleum products, gas and water 
Corrosion Allowance Minimum 2 mm reference value
Seismic Requirement Seismic intensity 7 reference requirement

Final dimensions, pressure ratings, materials and structural configurations are confirmed according to the approved technical specifications.

The applicable design requirements should also be clearly identified. ASME BPVC Section VIII, Division 1 may apply to pressure vessel design, while ASME B31.3, B31.4 or B31.8 may apply to associated process piping or pipeline systems, depending on the project scope. The applicable code and testing requirements must be confirmed for each project.

4. Quick Opening Closure: An Important Component of Both Units

The Quick Opening Closure is an important part of both a Pig Launcher and a Pig Receiver. It provides access to the barrel for loading or retrieving the pig.

RKSfluid offers three types:

  • Bandlock Type: DN300–DN2000, design pressure 1.6–30 MPa.

  • Clamped Type: DN150–DN1500, design pressure up to 35 MPa.

  • Inserted Type: DN80–DN300, design pressure up to 35 MPa.

The closure should be selected according to the required opening diameter, design pressure, temperature, medium and opening frequency. Its dimensions and connection arrangement must also match the barrel design.

Pig handling requirements should be confirmed at the same stage. RKSfluid's pigging equipment range is intended for use with different pig types, including foam pigs, cup pigs, brush pigs and intelligent pigs. The selected equipment dimensions and internal arrangement must be suitable for the specified pig.


5. Do Pig Launchers and Pig Receivers Have to Be Purchased Together?

No. They can be specified and purchased separately.

For example, a pipeline operator may need to replace an existing receiver while keeping the launcher in service. A pipeline extension may require an additional launcher connected to an existing receiving arrangement. Some projects also purchase both units as part of a new pigging package.

For an individual replacement unit, the buyer should provide the existing equipment drawings, connection dimensions and operating data. This information helps the manufacturer check whether the new equipment will fit the existing pipeline arrangement.

When both units are purchased together, their design conditions and connection details should be reviewed as part of the same project.


6. Inspection and Manufacturing Requirements

Inspection requirements should be agreed before manufacturing. The applicable design code, approved drawings and project Inspection and Test Plan (ITP) determine the required checks.
Typical inspection activities for pressure-containing pigging equipment may include:

  • Material verification and traceability
  • Dimensional inspection
  • Welding inspection and applicable non-destructive testing
  • Pressure testing
  • Inspection of connections and supplied components
  • Final inspection and review of manufacturing records

Required manufacturing and inspection records may include material certificates, welding records, NDT reports, pressure test reports and dimensional inspection records.

Third-party inspection and additional testing can be arranged when specified in the project requirements.


7. What Should Buyers Include in an RFQ?

A nominal diameter and pressure rating are not enough to prepare a complete technical quotation. The manufacturer also needs to understand the pigging operation and the existing pipeline connections.

For a Pig Launcher or Pig Receiver inquiry, buyers should provide:

  • Equipment type: Pig Launcher, Pig Receiver or both
  • Pipeline size and required barrel dimensions
  • Design pressure and operating pressure
  • Design and operating temperature
  • Process medium
  • Pig type and dimensions
  • Quick Opening Closure requirements, if specified
  • Applicable design code and project specification
  • Material requirements and corrosion allowance
  • Inspection, testing and documentation requirements
  • Equipment drawings or pipeline connection details, especially for replacement projects

An existing datasheet or general arrangement drawing is particularly useful when the new equipment must connect to an operating pipeline system.



Pig Launcher and Pig Receiver Manufacturer

RKSfluid manufactures Pig Launchers and Pig Receivers for oil and gas pipeline pigging systems, with reference nominal diameters from DN150 to DN2000 and design pressures from 1.6 to 16 MPa.

Equipment configuration, materials, pressure ratings, inspection scope and documentation can be specified according to project requirements.

Whether the requirement is for an individual Pig Launcher, a Pig Receiver or a complete pigging equipment package, RKSfluid can review the technical specifications and provide a project-based quotation.

Contact RKSfluid to discuss your Pig Launcher and Pig Receiver requirements.